Peerzada Mohsin Shafi and Gaurav Singh (2024) “The Hidden Costs of Geological Overbreak (GOB) in EPC Tunnel Projects: Assessing the Economic Impact”, International Journal of Innovative Research in Engineering and Management, 11(6), pp. 128–137. Available at: http://ijirem.irpublications.org/index.php/ijirem/article/view/101 (Accessed: 3 April 2025).