[1]
Peerzada Mohsin Shafi and Gaurav Singh 2024. The Hidden Costs of Geological Overbreak (GOB) in EPC Tunnel Projects: Assessing the Economic Impact. International Journal of Innovative Research in Engineering and Management. 11, 6 (Dec. 2024), 128–137.